This desk chairs transport and streets, which covers the roadworks programme, the resurfacing list, residents parking and the bus contract, and it answers ward six.
Roadworks are listed with the contractor, the start date and the date the street is due to reopen. Changes to those dates are posted the day they are made.
Route changes go to consultation before they are drawn. The comments received are published with the decision, not summarised away.
Resurfacing is ordered by condition survey, not by request. Every street is surveyed on a three-year cycle, and the score that puts it in or out of the programme is published with the list.
Utility roadworks are permitted, not commissioned. This desk sets the dates a company may dig and the date the street must reopen, and charges for every day it runs over.
A date given for a street reopening is a promise. A changed promise is posted the day it changes, not the week after.
Bus fares are set by the operator under the contract; this desk can change the routes and the minimum frequency, but not the price. The slip roads at the city boundary belong to the national roads body, and complaints about them are passed on rather than answered here.
A question nobody has asked yet is the one worth sending. It reaches a clerk, not a queue.