The office sits on the second floor, behind the long counter with the drawing table at the end of it. Fourteen officers work here, and whatever they decide is written down the same day it is decided.
Most of what arrives is ordinary: a loft conversion, a new shopfront, a hoarding for six weeks of scaffolding. The ordinary is handled quickly, so the difficult files get the hours they need.
Everything takes a case number at the counter, and that number does not change afterwards. A file that passes from one officer to another, or comes back a year later to be renewed, is still the same number on the same shelf.
A decision that cannot be read back from the file was never properly made. That is why it is written the day it is taken.
Nothing is settled in a corridor. Anything above the small works threshold goes to the Thursday review with the conservation officer in the room, and the minute of it is filed with the case so it can be read back.
The list for Thursday publishes on the Tuesday before it. A refusal is written out with the condition that was not met and what would have to change for the answer to be different, which is how most refused files come back a second time and pass.
Consent is the start of the work, not the end of this office's part in it. The inspections a permit requires are dated in public as they happen, and where one was missed the record says it was missed rather than leaving the gap unexplained.
Put a case number in once and the city tells you every time it moves. No account to make, nothing to install, and no waiting on hold to ask where it got to.